Development and Testing of Fully Submerged Hydrofoils With Drag Vane Control Installed on 15-ft. Runabouts, Robert C. Muncie, 25 Apr 1963(0155)
This report summarizes the development and test of three fully submerged hydrofoil configurations, with "drag vane" flap control as installed on 15 foot runabouts. The program described herein was funded by the Grumman Aircraft Engineering Corporation, and performed between July, 1962 and March, 1963. All testing was conducted from the Grumman Barge Facility at Jakobson's Shipyard, Oyster Bay, Long Island, New York.